Location
Nisha – Marat Area, KSA
Owner
National Grid N.G.
Overview
The project is a 132kV Overhead Transmission Line. The project includes design, installation and construction of new double circuit 132kV in three phases, using bundle conductor per phase, vertical configuration, (2×402 mm2) ACSR/AW .
Scope
Detailed Design package for 132 KV OHTL in three phases, using bundle conductor per phase, vertical configuration, (2×402 mm2) ACSR/AW.